| EnerTronics Engineering Corp | |||||||
| Project List | |||||||
| Period: 2002-2015 | |||||||
| Project Number | Project Title | Client | Project Phases (Refer to Legend) | Location | Description | Year Completed | |
| 1086 | BOF - LMF Project Management | ArcelorMittal | I,II | Indiana | Provide Project Management Support to the steel mill for projects related to the Reactor and Caster facilities projects. | on going | |
| 1085 | Chlorine PSSR and PSM activities support | ArcelorMittal | I,II | Indiana | Chlorine Piping and Standardization Upgrades. Process Safety Management to standardize nine chlorine site facilities as well as locations for safety equipment and functioning. Installation review, operations analysis. Chlorine Gas used: chlorinators, eductors, tubing, CPVC pipe, strainers, process water | on going | |
| 1084 | BOF Gas Cleaning Classifier Lifting Beam Improvements | ArcelorMittal | I,II,III | Indiana | Provide Structural Engineering analysis to plant utilities for hood cooling screens and classifier building lifting beam. Provided engineering calculations, documentation per OSHA requirements. Provided upgrade improvements for stiffnining of existing lifting beam assembly. Reviewed classifier screw lifting and handling mechanics and logistics. Provided concepts for improvements for alternate lifting beam and carriage assemblies. Provided structural engineering calculations and design documents towards the implementation of new improvements which included: structural plans and details, piece mark assemblies, logistics and material handling plan and notes for removal using new improvements. | on going | |
| 1083 | 80" HSM Clarifier Improvements | ArcelorMittal | I,II | Indiana | Provide Engineering Analysis to plant utilities for improvements towards water clarifiying equipment and processes. Data analysis, system sampling to understand associated problems. Market and vendor research for comparisons of equipment operations. Maintenance concerns and recommendations for stream lining the system. Inlet and drain piping modifications to reduce clogging. | 2014 | |
| 1082 | Chlorine PSM Compliance Audit | ArcelorMittal | I,II | Indiana | Chlorine PSM Compliance audit. Review and update of the costumers PSM program, questionaire and operating procedures. | 2014 | |
| 1071-03 | Hot Stip Mill - Motor Room and basement Cooling - Engineering Study | ArcelorMittal | I,II | Indiana | Provide engineering support for the improvements towards a motor room and basement cooling. Areas included: fan upgrades; additional ventilation, filters, balancing and pressurization | on going | |
| 1071-2 | Hot Stip Mill - West Ventilation House Upgrade | ArcelorMittal | I,III,IV | Indiana | West Ventilation House Upgrade. Ventilation design, blowers, ccoling coils, filters, mono rail, access doors, foundation, piping and instrumentation. Engineering design and commissioning.. | 2014 | |
| 1071-1 | Hot Stip Mill - East Ventilation House Upgrade | ArcelorMittal | I,III,IV | Indiana | East Ventilation House Upgrade. Ventilation design, blowers, ccoling coils, filters, mono rail, access doors, foundation, piping and instrumentation. Engineering design and commissioning.. | 2014 | |
| 1071 | Hot Stip Mill - Motor Room Cooling - Engineering Study | ArcelorMittal | I,II | Indiana | Provide engineering support for the improvements towards a motor room Cooling System. Areas included: fan upgrades; filters, monitoring, cooling coils, adjustments, and maintenance. | 2013 | |
| 1070 | Repair Roads and Site Access | Veterans Affairs | III,IV,VI | Kentucky | Provide engineering support for the improvements towards Site access and parking lot repairs, grading, sewers, Electrical site lighting, wayfinding signs | on going | |
| 1070 | Chlorine PSM Compliance Audit | ArcelorMittal | I, II | Indiana | Chlorine PSM Compliance audit. Review and update of the costumers PSM program, questionaire and operating procedures. | 2014 | |
| 1069 | Chlorine System Localized Warning Systems | ArcelorMittal | I,III,IV | Indiana | Chlorine Monitoring - Localized Warning Systems. Review, make recommendations and equipment selection for the customers chlorine gas hazard monitoring system. To include additional monitoring devices, standarization of lights and horns and inner-plant traffic warning signs | on going | |
| 1068 | Chlorine Piping Modificaitons and Safety Upgrades | ArcelorMittal | I,III,IV | Indiana | Chlorine Piping and Standardization Upgrades. Process Safety Management to standardize nine chlorine site facilities as well as locations for safety equipment and functioning. Installation review, operations analysis. Chlorine Gas used: chlorinators, eductors, tubing, CPVC pipe, strainers, process water | 2014 | |
| 1062 | Basement SPS Renovations | Veterans Affairs | I,III,IV | Indiana | SPS Renovations. Provide Mechanical, Electrical and Plumbing support to the design of a renovation of Supply Process and Sterilization Spaces in a 10 story hospital Building 1. HVAC, Heating Hot Water system, Domestic Cold Water, Plumbing, Sanitary Sewer, IT and Electrical | on going | |
| 1061 | BOF Hood Cooling Engineering, Pump upgrade, monitoring and system diagnostics Engineering and Equipment Design | ArcelorMittal | I,III,IV,V | Indiana | Provide engineering and survey support for the improvements towards a BOF Hood Cooling System. Areas included: monitoring, pressure, temperature, flow measurements; Pump upgrades; Heat Exchanger fan upgrades, adjustments, and maintenance. | 2013 | |
| 1060 | VERC and PACT Renovation, 1st Fort Wayne VAMC Hospital, Fort Wayne | Veterans Affairs | I, II, III, IV, V | Indiana | Mechanical, Electrical and Plumbing design of approximate 10,000 sq ft VERC and PACT . HVAC, Heating Hot Water system, Domestic Cold Water, mixing stations, Plumbing, Sanitary Sewer, Medical Gases, Fire Protection, IT and Electrical, HVAC and Air Handling Equipment. Overall building energy conservation and efficeincy. Ergonomics included design of comfortable working access and posture for a wide range of healthcare workers. Hygiene including "hands-free" operation of sinks and toilets | 2015 | |
| 1058 | Chlorine Monitoring, Commissioning and continue ssafety support services | ArcelorMittal | III,IV | Indiana | Review, make recommendations and equipment selection for the customer's site chlorine gas hazard related systems. To include additional monitoring devices , public notifications, advance warning system, standarization of warning lights and horns, update of P and IDs | 2013 | |
| 1057 | BOF - LMF Project Management | ArcelorMittal | I,III,IV,V | Indiana | Provide Project Management Support to the steel mill for projects related to the Reactor and Caster facilities projects. | 2013 | |
| 1056-02 | LMF Engineering, basin pumping additional capacity Engineering and Equipment Design | ArcelorMittal | I, II, IV,V | Indiana | LMF Hot Well water system addtiional pump capacity, engineering design | 2012 | |
| 1056-01 | LMF - WTP Engineering, Overflow and backwash Basing, East Chicago | ArcelorMittal | I, II, IV,V | Indiana | Engineering design to increase water treatment plant facility backwash basin capacity and provide additional overflow capacity in the case of emergency and maintenance. | 2012 | |
| 1053 | LMF - WTP Engineering study of operational constraints | ArcelorMittal | I, II, IV,V | Indiana | Engineering study to review existing operating constraints on LMF and water treatment plant facility due to new polluntant discharge elimination system (NPDES). Evaluate the need for additional capacity from backwash basin and route additional piping to NPDES. | 2012 | |
| 1052 | DOT-FHWA | Department of Transporation | II, V | Indiana | Design and Production of 10 informational modules to the LPAs for highway laws, construction, and state specific requirements. | 2012 | |
| 1051 | Clinical Improvements, 1st, 3rd and 4th floor at Richard L Roudebush VAMC Hospital, Indianapolis | Veterans Affairs | I, II, III, IV, V | Indiana | Provide Mechanical, Electrical and Plumbing support to the design of a 10,000 sq ft Clinical Spaces in a 10 story hospital Building 1. HVAC, Heating Hot Water system, Domestic Cold Water, mixing stations, Plumbing, Sanitary Sewer, Medical GasesFire Protection, IT and Electrical, HVAC and Air Handling Equipment. Protect and preserve other floors of the hospital that may be affected by work done.. | 2014 | |
| 1050 | BOF Caster Dryer Engineering Study | ArcelorMittal | I,II | Indiana | Provide engineering analysis for the replacement of an existing compressed air dryer. Data analysis, system testing to determine required capacities. Vendor research and comparison of existing equipment. Maintenance concerns and spare parts of current vendors being utilized by customer. Review of space requirements, new equipment envelope size and space constraints of location. Participated in vendor/customer meetings and made recommendations for purchase of equipment. | 2014 | |
| 1049 | BOF Hood Cooling Engineering, 360 Million BTU/Hr Cooling System upgrade including fan, VFD, piping and controls Engineering and Equipment Design | ArcelorMittal | I,III,IV,V | Indiana | Fall Protection: Accessibility platforms, non-slip gratings, safety toe-plates, handrails Electrical: temrminations, ANSI enclosures, and explosion proof ratings | 2010 | |
| 1047 | BOF - Caster Project Management | ArcelorMittal | I,III,IV,V | Indiana | Ergonomics: Assessment and implenetation design of manual-trolley around hazardous molten steel in limited confined space. Bending and turning stresses, load distribution to permit low center of gravity and prevention of flipping hazard. | 2012 | |
| 1046 | Chlorine Monitoring | ArcelorMittal | III,IV | Indiana | Review, make recommendations and equipment selection for the customers chlorine gas hazard monitoring system. To include additional monitoring devices and communication to a central notification system and the utilties dispatch and fire department dispatch center. | 2011 | |
| 1044 | BOF - Caster Project Management | ArcelorMittal | I, II, III | Indiana | Provide ongoing Project Management Support to the steel mill for projects related to the BOF and Caster facilities projects. | 2012 | |
| 1043 | Chlorine PHA | ArcelorMittal | I, II, III | Indiana | Process Hazard Analysis, risk analysis. General chlorine use and risks and nine chlorine site facilities on installation review, , operations analysis, as well as locations for safety equipment and functioning equipment used to handle the chlorine | 2011 | |
| 1042 | Chlorine P and I D | ArcelorMittal | I, II, III | Indiana | Process Safety Management to update and generate nine chlorine site facility process and instrumentation schematics as well as locations for safety equipment and functioning. Installation review, operations analysis. Liquid Chlorine used: evaporators, chlorinators, eductors, process water, solution water. Chlorine Gas used: chlorinators, eductors, process water, solution water | 2011 | |
| 1041 | Chlorine PSM Compliance Audit | ArcelorMittal | I, II, III | Indiana | Review and update of the costumers PSM program, questionaire and operating procedures. | 2011 | |
| 1040 | BOF - Caster Project Management | ArcelorMittal | I, II, III | Indiana | Provide Project Management Support to the steel mill for projects related to the BOF and Caster facilities projects. | 2011 | |
| 1037 | Building 6 Renovation at Aleda E Lutz VAMC Saginaw, Michigan | Veterans Affairs | I, II, III | Michigan | Provide Mechanical, Electrical and Plumbing support to renovate Building 6 currently used as a boiler facility to a 2 story office building for engineering. Plumbing, Sanitary Sewer, IT, Electrical, HVAC and Air Handling Equipment. | 2012 | |
| 1035 | GI 8 East Upgrade at Richard L Roudebush VAMC Hospital, Indianapolis | Veterans Affairs | I, II, III,IV | Indiana | Provide Mechanical, Electrical and Plumbing support for a GI relocation and upgrade from 4rth floor to 8th floor in Building 1. HVAC, Heating Hot Water system, Domestic Cold Water, mixing stations, Plumbing, Sanitary Sewer, Medical GasesFire Protection, IT and Electrical, HVAC and Air Handling Equipment. Protect and preserve other floors of the hospital that may be affected by work done. | 2012 | |
| 1034 | Consolidate Scope Sterilization at Richard L Roudebush VAMC Hospital, Indianapolis | Veterans Affairs | I, II, III | Indiana | Consolidate Scope Sterilization at the Richard L Roudebush VAMC. Included potable hot water and cold water. Objective was to renovate the existing space of the SPD area in the basement to allow for increased capacity of scope cleaning and sterilization; relocate all other locations currently utilized for scope cleaning and sterilization to the renovated SPD area in the basement. Include new equipment, ductwork, piping and appurtenances | 2009 | |
| 1033 | Emergency Department addition to building 58 | Veterans Affairs | I, II, III | Illinois | Provide Mechanical, Electrical, Structural and Plumbing support for a ED addition to building 58. Medical Gases, Plumbing, Sanitary Sewer, Fire Protection, HVAC and Air Handling Equipment, Structural foundations, floors, roof and walls. Landscaping and parking rerouting. Included potable hot water and cold water. | NA | |
| 1032 | Storm Sewer Drainage System for BOF at Steel Mill | ArcelorMittal | I, II, III | Indiana | Provide Design Concept drawings to include sewer manholes, drain piping and perforated french drain piping to take care of constant flooding issues between the BOF and Caster facilities. | 2009 | |
| 1031 | Structural Evaluation and Analysis Building 103 | Veterans Affairs | I, II | Illinois | Provide evaluation and analysis of the structural integrity and make recommendations in the form of a report to the VA for Building 103, Nursing Unit No. 4 Mechanical Room which was damaged when the electrical transformer outside the south end of the building caught fire. Inspection included roofing and insulation, wall and roof framing and review of the structural drawings | 2009 | |
| Energy FAA | Energy Audit for FAA facilities - Southern Region | Federal Aviation Administration | I, II, VI | Florida, Georgia, North Carolina, Tennessee | Provide Analysis on FAA facilities for energy reduction and conservation. Recommend Energy Conservation Measures related to light occupancy changes, operation of chillers, Air Handling Unit modifications, Pump modifications. Cooling tower operations. Included potable water,, cooling water supply and recirculation and cascading use. Renewable energy systems and roof-mounted PV cell concept design. | 2009 | |
| ABE-01 | Columbarium Expansion - Abraham Lincoln National Cemetery | Veterans Affairs | III | Illinois | Provide Columbarium Plaza to hold 3600 Niches, to include grading, landscaping, storm sewers, sidewalk parking and roadway, water supply, tank and irrigation zone control with spray nozzles. | 2009 | |
| 1030 | Electrical Upgrade - Buildings 58, 98, 104 | Veterans Affairs | I, II, III | Illinois | Electrical upgrade to expand transformers/ switchgears. Install new transformers outside of rooms (58 and 104) on concrete pads while current equipment inside rooms are being used. Switch over to new transformers after installed and remove current transformers, utilizing the space for additional equipment. Provide additional ventilation for Building 98 transformer room to current supply ductwork by means of fan, coils, reworking of supply intake outside of pipe chase area. | 2013 | |
| 997-05 | BOF Alloy Conveyor Storage Building - Concept | ArcelorMittal | I | Indiana | New alloy conveying system for BOF. New storage building for alloy system | 2012 | |
| 1031 | PHA Analysis Sessions for Co-Generation Plant under construction | ArcelorMittal | I | Illinois | Hazard Analysis, risk analysis, Energy usage review and reduction, new Power Plant facility design process and piping review,. Included water suply and condensate systems | 2009 | |
| 981 | Process Safety Management - Propane System Coordinator | ArcelorMittal | I, II, V, VI | Indiana | Maintenance report keeping, equipment changeovers, HAZOP Training, | 2013 | |
| 990-05 | BOF Stack Replacement and Upgrade - Engineering detail design | ArcelorMittal | III | Indiana | New stack shell design, access platforms, ladders, Gas flow measurements, electrical and lighting, Concrete reinforcement design around base of stack | 2009 | |
| USGS | DOI- US Geological Survey - LMERS - National Park Service | Department of the Interior - National Park Service | II, V | Indiana | The feasibility study for the conversion of a Visitor Center to a Claas III Lab required assessment of existing building structure, layout, access issues, utilities and outlying structures. New utilities concept design included water and wastewater systems. | 2011 | |
| 1022 | Security Upgrade - Outpatient Pharmacy and Agent Cashier | Veterans Affairs | I,II,III | Illinois | Upgrade security systems and additional features to include cameras, windows, reflected ceiling relocating and wall relocation | 2008 | |
| 1021 | SPD Suite - HVAC and Pure Water System Upgrade | ArcelorMittal | I,II,III,IV | Illinois | Water supply and purificaation system based on RO and for SPD washing requirements. Air borne Contamination Control: Upgrade of HVAC, Operational objectives with Energy cost sensitive approach | 2008 | |
| 1020 | New Storage Building with multiple truck bays including electricity, lighting and heating. New Soil Pit design to replace for ground maintenance soil storage at Cemeteries (Design-Build) | Veterans Affairs | I,II,III,IV,VI | Kentucky | Site layout, Potable water supply and heating, sewers, foundations, block framing, overhead doors, Electrical, fire hydrant, roof, Fire Detection for a small warehouse / storage Building, | 2007 | |
| 997 | BOF Alloy Feed Conveying System - Engineering Study Design. Bin sizing, equipment specifications and Request for Proposal | ArcelorMittal | I,II,III | Indiana | Site Utilities, Equipment Layout, Furnace chutes, structural floor layout, electrical, controls, weigh belt feeders, alloy feed receipt | 2008 | |
| GAF-02 | GAF Materials - Engineering Construction Management | ArcelorMittal | III,IV | Indiana | construction management services, installation and design recommendations | 2007 | |
| 1014 | Fuel Loading Station - Engineering Services (Detailed Design | ArcelorMittal | I,II,III | Indiana | Demolition existing truck fueling station, fuel piping, new loading ramp, new weather shelter, electrical, lighting | 2007 | |
| 1023 | PHA Analysis Sessions for Co-Generation Plant, | ArcelorMittal | I,II,VI | Illinois | Hazard Analysis, risk analysis, Energy usage review and reduction, new Power Plant facility design process and piping review, | 2007 | |
| 1017 | Engineering Services to provide ETRAINING for operators and maintenance personnel at LMF Water Treatment Plant | ArcelorMittal | I,II,V,VI | Indiana | Cooling towers, pumps, chemical additives, LMF operations, maintenance, backwash basins, Water Scrubbers, Cooling Water Systems, Water Sprays | 2007 | |
| 1016 | BOF Hood Cooling Engineering, 360 Million BTU/Hr Cooling System upgrade including fan, VFD, piping and controls Study and Equipment Recommendations | ArcelorMittal | I,II | Indiana | Hood Cooling water system monitoring, heat exchanger fans, Air humidity and speed recording, BOF Furnace consumption | 2007 | |
| 1015 | Engineering Services for Natural Gas Mixing Station to supply in the case of an emergency to Coke Oven Gas Main Pipe Line - Design and installation | ArcelorMittal | I,II,III | Indiana | Mixing station building, ventilation, Natural Gas, Coke Oven Gas, steam tracing relocation, condensate relocation | 2007 | |
| 1013 | Engineering Study and Equipment Recommendations for Pickle Line Strip Surface Inspection System | ArcelorMittal | I,II,III | Indiana | Pickle Line existing utilities field and drawing surveys, piping modifications, equipment modifications new equipment installation | 2006 | |
| 1012 | Engineering Study and Recommendation for Pickle Line Fume Exhaust System Upgrade and Replacement - Environmental Controls | ArcelorMittal | I,II,III | Indiana | Pickle Line existing utilities field and drawing surveys, piping modifications, equipment installation, demolition, Water supply and recirculation systems | 2006 | |
| 996 | Air Compressor Upgrade Engineering Study, Design and Installation | ArcelorMittal | III,IV,V,VI | Indiana | Site Utilities, Water , natural gas, sewers, foundation pad, electrical, demolition, Air Reservoir tanks, piping, silencer | 2006 | |
| GAF-01 | GAF piping and valve stations replacement and upgrade - Engineering study and piping installation design | ArcelorMittal | I,II,III | Indiana | piping design, new pump installation, pipe supports, steam piping, condensate piping, liquid asphalt piping | 2006 | |
| 991-01 | New Storage Building with multiple truck bays including a washbay, site utilities, natural gas, electricity, water, sanitary and storm sewers ( Design-Build) | Veterans Affairs | I,II,III,IV | Illinois | Surveying, geotechnical investigations,Site Utilities, Water,natural gas, sewers, foundation, framing, brick exteriors, insulated, Electrical, Lighting, HVAC, roof, Fire Detection. Included potable hot water and cold water for a warehouse / storage building. Water and waste water system design. | 2006 | |
| 990-01 | Electrical Upgrade, NEC Violations, 5 hospital buildings and complex, 200,000 sq ft area | Veterans Affairs | I,II,III,IV | Illinois | Electrical conduit overfill, new panel, conduits, clearances, tap violations | 2006 | |
| 990-01-02 | BOF Stack Replacement and Upgrade - Study design | ArcelorMittal | I,II | Indiana | Foundation and structural assessments, current gas flume assessment, new stack reinforcement design, access platforms, ladders and stairs, Gas flow measurements | 2006 | |
| 989-01 | BP Propylene Facility - Engineering Services | ArcelorMittal | I,II | Indiana | Tank - decompression and cleaning | 2006 | |
| 992 | BOP PHA Gas Cleaning Engineering Study | ArcelorMittal | I,II,VI | Indiana | Duct layout, Furnaces, Water sprays, Heat analysis, Safety concerns, Maintenance recommendations | 2006 | |
| 976 | Gas Cleaning System review for damper operations and furnace control for two-furnace operations for increased productivity | ArcelorMittal | I,II,VI | Indiana | Scrubber, Venturi, Waste Water Treatment,Electrical, HVAC, CO Detection and Suppression, | 2006 | |
| 966-2 | Two(2) 39,000 cfm Fume Exhaust Systems for Process Line, including scrubber & fan specifications, hood & ductwork designs - Detailed Design | ArcelorMittal | I,II,III,IV,V | Indiana | Equipment Layout, Hood & Duct Design, Lifting Mechanism & Building Designs, Electrical, HVAC, Fire Detection, Fire Suppression | 2005 | |
| 963-01 | Etraining System for Process Heater and Gas Cleaning Systems at a Sinter Plant, modules | ArcelorMittal | I,V,VI | Indiana | Process Review, Site Walkdown, Module Development | 2005 | |
| 960-04 | 2500 GPM Emergency Water System for an industrial plant, including tie-in into existing water supply, pumping & recirculation piping, pump controls & fuel oil tank conversion to water service - Detailed Design | ArcelorMittal | I,II,III,IV,V | Indiana | Emergency Water supply assessment, design of emergency system including, tank, piping | 2005 | |
| 984-01 | Cross Country Oil Line system, 4000 ft, steam heated | ArcelorMittal | I,II,III,IV | Indiana | Flexibility, loops, control system, multiple users | 2005 | |
| 977-02A | New Boilerhouse Desuperheated Water Generation, including reverse osmosis skids, 1st Pass 1000 gpm, 2nd pass 100 gpm, tank, & transfer pumps, deaerator with controls & interconnecting piping - Detailed Design | ArcelorMittal | I,II,III,IV,V | Indiana | Potable water supply, High purity water supply with a second pass RO unit. Foundations, Space Utilization, Control Scheme, Piping Installation, Electrical | 2005 | |
| 976-02 | Engineering Services for new electrically driven, 15 HP pumps with platform & piping for a chemical loadout station - Detailed Design | ArcelorMittal | I,II,III,IV | Illinois | Structural Design, Pump Location, Light Oil Piping Design, Electrical | 2005 | |
| 975A | Pre Carbon Facility - Fuel Change over - COG Distribution Analysis, Suitability Review and Facility Definition for six(6) 60 MM BTU/HR Coke Oven Gas Trains. | ArcelorMittal | I, II,VI | Indiana | Coke Oven Gas Piping, Tie-In Locations, Energy Savings Evaluation, Electrical, HVAC, roof, Fire Detection, Fire Suppression | 2005 | |
| 978 | New Boilerhouse Utility Piping, Four(4) 150,000 lb/hr of Steam at 900 psig including coke oven gas, natural gas, instrument air (IA), nitrogen (N2), potable water & service water with supports & tie-in locations - Detailed Design | ArcelorMittal | I,II,III | Indiana | Design of utilities including potable water system. | 2005 | |
| 976 | Commissioning Services for a Light Oil Loadout Station Upgrade, including new operator panel, flowmeter & vapor recovery system | ArcelorMittal | IV,V | Illinois | Checklist Development, Operator Training, Troubleshooting, Electrical, HVAC, Fire Detection, Fire Suppression | 2005 | |
| 975 | Engineering study that surveyed and identified savings in complex of 400,000 lb/hr of steam system with 10,000 ft of steam piping. | ArcelorMittal | I,II,VI | Indiana | Site Investigation, Survey Documentation, Report Development | 2005 | |
| 966-1 | Two (2) 39,000 cfm Fume Exhaust System for Electr Tinning Lines, including scrubber & fan specifications, hood & ductwork designs - Conceptual Design Study | ArcelorMittal | I,II,III | Indiana | Equipment Location Scenarios, Utility Tie-In Determination, Duct Routing Selection, Electrical, HVAC, Fire Detection, Fire Suppression | 2004 | |
| 965-1 & 965-2 | Etraining system for Hot Strip Mill Operations & Maintenance | ArcelorMittal | V | Indiana | Module Development, Process Review, | 2004 | |
| 960-02 | Engineering Study and evaluation of a 100,000 gpm Plant Water System, including taking and analyzing flow measurements | ArcelorMittal | I,II | Indiana | Plant Water System Walkdown, Flow Measurements, Piping Replacement | 2004 | |
| 959-2 | New Air Compressor Facility for a Pickling Line, including 2 x 2000 cfm compressor station layout, selection, control scheme development and piping layout - Detailed Design | ArcelorMittal | III,IV | Indiana | Cooling water system design including strainers | 2004 | |
| 959-1 | Engineering Study for new air compressor facility at a Pickling Line, including site walkdowns, drawing research and flow measurements | ArcelorMittal | I,II | Indiana | Compressor Selection, Equipment Location Scenarios, System Evaluation | 2004 | |
| 960 | Engineering Study and evaluation of a 110,000 GPM Cooling Water System, including system replacement scenarios & Emergency Pumping System | ArcelorMittal | I,II | Indiana | Emergency Water supply assessment, design of emergency system including, tank, piping | 2004 | |
| QBOP-1 | Training System update for a Q-Bop Propane System, OSHA required | ArcelorMittal | V | Indiana | Module Update | 2004 | |
| 970-01 | Process Safety Management & Training Services for a chemical loadout station upgrade | ArcelorMittal | V | Illinois | Training Manual Development, PSM Plan Modification | 2004 | |
| 956-2 | Chemical Loadout Station Vapor Recovery Upgrade, including vapor recovery, plc controls, utility piping & loadout platform - Detailed Design | ArcelorMittal | III | Illinois | Valve Station Design, Pipe Routing, Structural Platform Design | 2004 | |
| 972 | Feasibility Study for a heating station roof conversion from an open loop cooling system to a closed loop cooling, 100 MM BTU/hr system | ArcelorMittal | I,II | Indiana | Envelope Determination, Existing Utility Evaluation, Calculations, Electrical, HVAC, roof, Fire Suppression | 2004 | |
| 948 | Computer Based Training for 2000 scfm Fume Exhaust System Upgrade at a Chrome Plating Facility | ArcelorMittal | V | Indiana | Graphic Design, Module Development, Classroom Training | 2003 | |
| 947 | Galv Line Compressed Air Knife Study | ArcelorMittal | I,II | Indiana | Process Evaluation, Piping Modifications | 2003 | |
| 956-1 | Conceptual Study for a Chemical Loadout Station Vapor Recovery Upgrade, including location selection, tie-ins for new utilities and Control Panel Location | ArcelorMittal | I,II | Illinois | Location Options, Utiility Tie-Ins, Electrical | 2003 | |
| 927A | Oxygen System Upgrade for a Building Including new oxygen control stations, piping, alarms & controls - Detailed Design | Veterans Affairs | I,II,III,IV | Illinois | Alarms, Power & Control Wiring, Oxygen Piping, Site Preparation, Electrical, HVAC, Fire Detection | 2003 | |
| 953 | Engineering Study of Hood Cooling Water system for a two (2) molten 285 Ton Furnaces | ArcelorMittal | I,II | Indiana | Data Gathering & Evaluation, Report Development | 2003 | |
| 952 | PSM Administration for a propane system at Q-BOP | ArcelorMittal | I,II,V | Indiana | Classroom Training Sessions, Audit Performance | 2003 | |
| 950 | Drawing Revisions for power generation facility | ArcelorMittal | III | Illinois | Electronic Document Management, CAD Work | 2003 | |
| 946 | Chrome Plating Facility 2000 cfm Fume Exhaust Upgrade, including, ductwork design, plating solution evaporation system & storage tank design - Detailed Design | ArcelorMittal | I,II,III | Indiana | Tank Design, Pipe Mat'l Selection, Equipment Selection, Platform Design, HVAC, Electrical | 2003 | |
| 945 | Gas Cleaning Stack Performance improvement, review and recommendations for the gas cleaning system | ArcelorMittal | I,II | Pennsylvania | Process Review, Report Development | 2003 | |
| 927-1,2 | Chrome Line Plating Solution Temperature Control for improvement in yield and quality | ArcelorMittal | I,II,III | Indiana | Piping Design,Equipment Selection, Process Calculations | 2002 | |
| 922-3 | Computer Based Mechanical & Electrical Training Programs for Air Compressor Facility Operation & Maintenance | ArcelorMittal | V | Indiana | Training Program Development | 2002 | |
| 922-2 | Compressor Facility, Including Compressors (2000 cfm x 4), Dryer, Receivers (2 x 15,000 gal.), Piping Modifications & Control Systems - Detailed Design | ArcelorMittal | III,IV | Indiana | Compressors, Dryers, Receivers, Location Selection, Piping, Electrical, HVAC, Fire Suppression | 2002 | |
| 944 | As-Built Drawing Documentation for a power generation facility | ArcelorMittal | III | Illinois | CAD Work, Drawing Management | 2002 | |